In 2017, Tecwill delivered a COBRA C80 mobile concrete batching plant to Hæhre Entreprenør AS for the Smibelg and Storåvatn hydropower project in Northern Norway. The plant was commissioned to produce high-strength structural concrete and steel fiber-reinforced shotcrete (fibercrete) at a remote construction site with no road access.
Following the hydropower project, the same concrete batching plant was relocated to Kvitsøy in Western Norway to support concrete and shotcrete production for E39 Rogfast, which is set to become the world's longest and deepest subsea road tunnel.
These projects demonstrate the long-term value of portable concrete batching technology: one plant investment can support multiple major infrastructure projects, with relocation extending its productive lifetime and improving return on investment.
Tecwill COBRA C80 portable concrete batching plant for the SmiSto hydropower project in Northern Norway.
The Smibelg and Storåvatn hydropower development, also known as SmiSto, is located in the municipalities of Rødøy and Lurøy in Nordland County, Northern Norway. The project consists of two hydroelectric power plants situated on opposite shores of the Gjervalen fjord.
The development was realized in 2022 by SmiSto Kraft AS, a company jointly owned by Salten Kraftsamband and Helgeland Kraft. Together, the two power plants generate approximately 210 GWh of renewable electricity annually, equivalent to the energy consumption of around 10,500 households.
Hæhre Entreprenør AS carried out the construction works under a contract valued at approximately NOK 830 million. The construction period extended from 2015 to 2020.
The project was also among the first in Norway to use building information modeling (BIM) and digital 3D models instead of conventional construction drawings for both underground and civil engineering works.
Reliable on-site concrete production was essential, particularly for underground construction and hydropower structures requiring high-strength concrete and steel fiber-reinforced shotcrete.
One of the main challenges of the SmiSto project was its remote location. With no road access to the construction site, all equipment and materials had to be transported by barge.
This made conventional ready-mixed concrete deliveries impractical and created a need for an independent on-site concrete production facility.
The concrete batching solution needed to combine several important features:
The temporary nature of the construction site also made it important to minimize permanent infrastructure and foundation work.
Tecwill's COBRA C80 portable concrete batching plant provided a solution that addressed these logistical, environmental and concrete production requirements while allowing the equipment to be reused on future projects.
Tecwill supplied a winterized COBRA C80 concrete mixing plant configured to meet the specific requirements of the SmiSto hydropower development.
The patented COBRA mobile plant concept combines factory-preassembled modules, portable steel foundations and a reusable aggregate loading ramp. This enables rapid installation with minimal construction work at the project site.
The original delivery included:
The plant, winter equipment, heating system, portable foundations and loading ramp structures were prepared and tested at Tecwill's factory in Joensuu before shipment to Norway.
Factory preassembly reduced the amount of mechanical and electrical installation required at the construction site, an important advantage in a location where access, available resources and working conditions were particularly challenging.
Installing a concrete batching plant in a remote location during the Norwegian winter presents significant logistical and operational challenges.
At the SmiSto construction site, the COBRA C80 was installed and commissioned together with the customer's production personnel under cold and windy conditions. Concrete production started within a few days.
The plant's winterized construction, including thermal insulation of all plant modules without thermal bridges, enabled production to begin despite the demanding weather conditions.
Key takeaway: For contractors operating in cold climates, the combination of factory-preassembled equipment, integrated winter protection and aggregate heating systems can reduce on-site installation requirements and support reliable concrete production throughout the construction season.
The SmiSto project demonstrates how a winterized mobile concrete batching plant can be commissioned quickly, even at remote construction sites with challenging transportation logistics and harsh weather conditions. For more detail on what this involves, see our guide on winter insulation for mobile concrete batching plants.
Hydropower and underground construction require different concrete properties depending on the structural and operational requirements of each application.
At the SmiSto project, the COBRA C80 was configured to produce two particularly demanding types of concrete:
To meet these requirements, the plant was equipped with a Tecwill countercurrent planetary mixer and a fully automatic fiber dosing system.
Accurate fiber dosing and uniform fiber distribution are particularly important in shotcrete production. Insufficient distribution can cause fiber clumping, inconsistent concrete quality and difficulties during spraying.
Tecwill's "FLYING" aggregate dosing and weighing system enables steel fibers to be dispensed directly onto the moving bed of aggregates on the weighing belt. The fibers are distributed throughout the aggregate mixture before the material collected in the holding hopper is released into the concrete mixer, allowing fiber distribution to begin before the actual mixing process.
Combined with the countercurrent planetary mixer, this technology supports the production of homogeneous, high-quality fiber-reinforced concrete, also called as fibercrete.
The general technical benefits of Tecwill's automatic fiber dosing and premixing technology include:
For hydropower, tunneling and mining projects, the ability to produce both structural concrete and fiber-reinforced shotcrete using the same batching plant provides additional production flexibility. For a deeper look at this topic, see our article on how to produce high-quality fiber-reinforced concrete.
One of the main advantages of the COBRA mobile concrete batching plant concept is that mobility extends beyond the batching and mixing equipment itself.
The COBRA C80 delivered to the SmiSto project was installed on portable steel foundation frames and equipped with a portable aggregate loading ramp. The relatively low aggregate loading height reduced the required ramp size and overall plant footprint, making the batching plant suitable for a construction site with limited available space.
Conventional concrete batching plant installations may require permanent concrete foundations and site-specific loading structures and building around the plant. When project is completed, these structures may need to be abandoned, demolished or removed.
With the COBRA concept, the portable foundations and loading ramp elements are designed to be transported and reused together with the plant. This approach can reduce:
For temporary construction projects with strict environmental requirements, reusable plant infrastructure can offer both economic and environmental advantages.
The ability to relocate the complete concrete production facility was an important feature of the original delivery. Its long-term value became evident when the COBRA C80 was transferred to another major Norwegian infrastructure project.
The modular design of Tecwill's COBRA C80 enables rapid installation, efficient on-site concrete production and relocation between construction projects.
Following its original assignment at the SmiSto hydropower project, the COBRA C80 mobile concrete batching plant was relocated to Kvitsøy to support concrete production for the E39 Rogfast tunnel project.
E39 Rogfast is one of Norway's largest transport infrastructure developments. The project includes a 26.7-kilometer subsea road tunnel connecting Randaberg and Bokn beneath the Boknafjord. Once completed, Rogfast will become the world's longest and deepest subsea road tunnel, replacing a ferry connection and improving transport links along Norway's western coast. At its deepest point, the tunnel reaches approximately 392 meters below sea level.
The E02 Rogfast Midt section, constructed from Kvitsøy, is the largest and most complex construction contract within the Rogfast development. Awarded to the Implenia/Stangeland joint venture in 2024, the construction contract is valued at approximately NOK 6.24 billion and includes around 8.8 kilometers of twin-tube main tunnel, underground junctions and connecting ramps.
The scale and complexity of the project place significant demands on concrete production, material logistics and delivery reliability over several years.
Ølen Betong AS is one of Norway's leading suppliers of ready-mixed concrete, concrete products and precast elements for infrastructure and tunnel construction.
In November 2024, Ølen Betong announced its largest concrete supply contract to date for the E02 Rogfast Midt project. The contract, awarded by Implenia Norge AS (JV Implenia/Stangeland), covers the supply of:
The precast elements are manufactured at Ølen Betong's production facilities in Sveio and Sandeid, while ready-mixed concrete is supplied from a mobile concrete batching plant located on Kvitsøy. Ready-mixed concrete deliveries began in November 2024, with supplies planned to continue over several years.
Establishing concrete production close to the tunnel construction site supports efficient delivery logistics and reduces dependence on concrete transportation from external production facilities. For a major tunneling project on an island, local concrete production is particularly valuable for coordinating production with construction schedules and maintaining reliable concrete availability.
The relocation of the COBRA C80 from the SmiSto hydropower development to Rogfast illustrates how a portable concrete batching plant can continue to serve demanding construction projects years after its original delivery.
Tecwill COBRA C80 concrete plant at Rogfast tunnel site producing concrete and shotcrete for sub sea tunnel structures.
The COBRA C80 originally delivered in 2017 demonstrates that the value of a mobile concrete batching plant is not limited to its first construction project.
Its relocation from a remote hydropower construction site in Northern Norway to one of the world's most ambitious subsea road tunnel projects illustrates the practical advantages of investing in genuinely relocatable concrete production equipment.
For concrete producers and contractors involved in hydropower, tunneling, highways, mining, wind farms and other infrastructure developments, mobility can improve equipment utilization, reduce project-specific investments and provide greater operational flexibility.
By designing the entire concrete production facility for repeated installation and relocation, Tecwill enables concrete producers to establish production where it is needed and move the equipment when project requirements change.
Tecwill’s COBRA C80 mobile concrete batching plant is designed for long-term use across multiple infrastructure projects, combining mobility, production flexibility and reliable operation in demanding conditions.
The Tecwill COBRA C80 is a factory-preassembled mobile or portable concrete batching plant designed for ready-mixed concrete, on-site concrete production and demanding applications such as fiber-reinforced shotcrete. Its modular construction, portable foundations and optional winter equipment make it suitable for both temporary and permanent concrete production facilities.
A winterized mobile concrete batching plant with portable foundations, an integrated heating system and equipment for producing structural concrete and shotcrete is well suited to remote hydropower construction. At the SmiSto project in Northern Norway, the COBRA C80 was transported to a construction site without road access, installed and commissioned within a few days.
Yes. Tecwill COBRA mobile concrete batching plants are designed for relocation and repeated installation. The plant modules, portable steel foundations and aggregate loading ramp elements can be transported and reused at subsequent construction sites. The COBRA C80 originally delivered for the SmiSto hydropower project was later relocated to the E39 Rogfast tunnel project in Norway.
A Tecwill COBRA C80 mobile concrete batching plant supports Ølen Betong's ready-mixed concrete production at Kvitsøy for the E02 Rogfast Midt tunnel project. Ølen Betong's concrete supply contract announced in November 2024 includes 120,000 m³ of ready-mixed concrete.
Yes. Tecwill COBRA concrete batching plants can be equipped with insulated plant modules, heating systems and winter equipment for cold-weather concrete production. At the SmiSto hydropower project, the COBRA C80 was installed and production started within a few days despite cold temperatures and strong winds. Tecwill also offers aggregate and water heating solutions as part of the plant configuration.
Yes. A concrete batching plant equipped with appropriate mixing technology, accurate material weighing and automatic fiber dosing can produce both structural concrete and fiber-reinforced shotcrete. With right mixer set-up also grout can be produced. The COBRA C80 supplied to the SmiSto project was specifically configured for high-strength concrete and steel fiber-reinforced shotcrete production.
Tecwill's "FLYING" aggregate weighing system enables fibers to be dispensed onto the moving aggregates during the batching process. This premixing method promotes uniform fiber distribution before the materials enter the mixer, reducing the risk of fiber clumping and supporting consistent shotcrete quality for tunneling and underground construction.
Not necessarily. Tecwill COBRA plants can be installed on portable steel foundations when site conditions allow. Reusable foundations and aggregate loading ramp elements minimize permanent construction work and enable the plant infrastructure to be relocated to subsequent projects. There is not required any concrete foundation under the the Cobra concrete plant.
A relocatable concrete batching plant can reduce repeated foundation investments, installation and dismantling work, and the consumption of materials for temporary production infrastructure. Reusing the same batching plant, portable foundations and loading ramps across multiple projects can improve equipment utilization and long-term return on investment while reducing demolition and site restoration requirements.
For contractors and concrete producers evaluating mobile batching solutions for hydropower, tunneling and other infrastructure projects, explore the full COBRA product range, visit the COBRA C80 product page for technical specifications or learn more about Tecwill's shotcrete production solutions.
Read also how a COBRA C120 portable concrete batching plant supports Norway's E6 highway and tunnel project.